To
Complete a Pilot Test....
The
Customer must Furnish:
- One each 40 AMP 120 VAC connection
- Site security
- On-site assistance during set up of pilot unit
- Project contact list
- Sample bottles, chains of custody, coolers, shipping, and
contact information for laboratory analysis of split samples
- Water supply to pilot unit of 45 gpm at 20 to 40 psi through
a two inch connection
- Chemicals
- Sewer or waste connection for filter discharge at 20 gpm
for eight hours per day and backwash flow of up to 45 gpm.
- Level site for pilot unit placement
- Automobile access to site
Under
normal conditions, Filtronics will furnish:
- Up to five days, one person, eight hours per day of on-site
assistance to contractor/owner to place system in operation.
- Pilot report with narrative of pilot events, summary of data,
and graphic representation of field and laboratory results.
- On-site analytical equipment.
- Free telephone support for assistance during installation
and operation of the plant.